home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V16_9 / V16NO943.TXT < prev    next >
Text File  |  1993-08-03  |  42KB  |  858 lines

  1. Space Digest                Fri, 30 Jul 93       Volume 16 : Issue 943
  2.  
  3. Today's Topics:
  4.                            Cats in zero gee
  5.                 DC-X Prophets and associated problems
  6.                          DC-X Update 07/28/93
  7.                Hubble solar arrays: how'd they foul up?
  8.           Low Tech Alternatives, Info Post it here! (2 msgs)
  9.               NASA's planned project management changes
  10.         Omnibus Space Commercialization Act (Title II: Assets)
  11.                            Retro Aerospace
  12.  
  13.         Welcome to the Space Digest!!  Please send your messages to
  14.         "space@isu.isunet.edu", and (un)subscription requests of the form
  15.         "Subscribe Space <your name>" to one of these addresses: listserv@uga
  16.         (BITNET), rice::boyle (SPAN/NSInet), utadnx::utspan::rice::boyle
  17.         (THENET), or space-REQUEST@isu.isunet.edu (Internet).
  18. ----------------------------------------------------------------------
  19.  
  20. Date: Thu, 29 Jul 1993 13:58:00 GMT
  21. From: Tim Harincar <soc1070@vx.cis.umn.edu>
  22. Subject: Cats in zero gee
  23. Newsgroups: sci.space
  24.  
  25. In article <0gJj7l200WB_8HhVw0@andrew.cmu.edu>, Kevin William Ryan <kr0u+@andrew.cmu.edu> writes...
  26. >mancus@pat.mdc.com (Keith Mancus)
  27. >>> Not a cat you like certainly.  And by the way, cats do not take well to
  28. >>> microgravity--it's been tried.
  29. >>
  30. >>  Could you give me a reference to this?  I wasn't aware it had ever been
  31. >>tried.
  32. >
  33. >    I recall seeing a reference to this in Tom Wolfes 'The Right Stuff'.
  34. >Basically, nobody at the time thought the question worth a flight of the
  35. >Vomit Comet, so the sent a cat up in a fighter with a camera in the
  36. >cockpit. Most of the film shows the pilot trying to pull the cat off his
  37. >arm. When he finally did, the cat 'magically' levitated back to his suit
  38. >and remained there for the rest of the flight despite his best efforts.
  39. >
  40. >    In other words, the only time _I_ know of it being tried the cat
  41. >wasn't too happy about it, and the pilot wasn't doing a very good job of
  42. >maintaining zero G due to the cat distracting him by attempting to claw
  43. >through him.
  44. >
  45. >    I haven't personally heard of anyone doing it in that larger airplane.
  46.  
  47. My wife and I were discussing this thread last night (we have 3 cats so
  48. they tend to occupy a lot of our attention... :)
  49.  
  50. I don't think it would be a problem to *train* a cat for zero g. Starting
  51. with a kitten, you could acclimate it well enough to the people on its
  52. mission and flying so that it wouldn't freak out on a plane. Then you
  53. could start testing the zero g part. [How many cats like cars? Not many,
  54. but one of our doesn't mind it - we started him early as a kitten, when
  55. my wife and I were dating she always brought him with to my apartment].
  56.  
  57. The basic problem with lofting it with the crew on the shuttle, though,
  58. is the litter box... ;) You want to talk about a 'Waste Management
  59. nightmare'.
  60.  
  61. --
  62. tim harincar
  63. soc1070@vx.cis.umn.edu
  64.  
  65. ------------------------------
  66.  
  67. Date: 29 Jul 1993 09:50:33 -0400
  68. From: Pat <prb@access.digex.net>
  69. Subject: DC-X Prophets and associated problems
  70. Newsgroups: sci.space
  71.  
  72. In article <236t0m$6qg@voyager.gem.valpo.edu> mjensen@gem.valpo.edu (Michael C. Jensen) writes:
  73. >: STS Missions.
  74. >
  75. >:      Cargo to earth.    RV's do this much cheaper.
  76. >
  77. >Um, which systems are those? I still havn't seen many large volume or
  78. >payload return systems out there.. am I missing something?
  79. >
  80.  
  81. Look at the russian capsula systems,  the Discovery satellitte
  82. systems.  The Big Bird satellittes used to daily even
  83. weekly return film capsules.   If necessary the systems can
  84. be scaled up.  Apollo was essentially a medium payload return system.
  85.  
  86. Most payloads don't need to be returned.
  87.  
  88.  
  89. >:      On orbit science missions (Untended)  GAS cans, SPAS, LDEF
  90. >:      ELV's with RV's  do this much cheaper.
  91. >
  92. >I find it enjoyable to see that all three of the specifically named
  93. >programs are shuttle payloads.. the first (GAS) which is a specific
  94. >project by NASA to bring space related research within the reach of
  95. >college students who otherwise would be denied such experiences..
  96. >
  97.  
  98. Look at ALexis,  pound for pound the same price as a GAS Can,
  99. yet far more productive.   Look  at the APollo  materials
  100. science experiments.   Look at the whole constellation of
  101. orbiting scienc birds.  COBE  is far cheaper  and far more
  102. productive then say ASTRO.
  103.  
  104. I named the three big shuttle  science missions i thought of
  105. off hand  so you could compare them to things like explorer,
  106. Mariner,  Landsat,  Nimbus.     which ones are  doing the working science.
  107.  
  108.  
  109. >:      ON ORBIT Bio science experiments.  RVs  and MIR do this
  110. >:      for far less.
  111. >
  112. >I've heard a lot of conflicting opinion about this one.. in relations to
  113. >MIR that is.. I still don't see any high quality RV's out there outside
  114. >shuttle..
  115. >
  116.  
  117.  
  118. Look at Skylab.  it did far more bio-science work then shuttle will
  119. in it's entire program life.   And it had a high quality RV.
  120.  
  121. the Apollo CSM.
  122.  
  123. Plus apollo-soyuz.  those were very serious science  missions
  124. conducted during the  rendevous.  at least as good as
  125. Shuttle mid-deck experiments.
  126.  
  127.  
  128.  
  129. >:      On ORbit system repair (satellitte rescue, etc)
  130. >:      It is cheaper  or nearly so to AIP the system and launch replacements.
  131. >:      HST cost 1.6 Billion in DDTE(according to wales.)  the HST
  132. >:      repair mission is costing 800 Million.  It's a judgement
  133. >:      call on what's cheaper.
  134. >
  135. >You know.. it's entertaining to see the 5+5=39.6 logic sometimes shown
  136. >in these "accurate" cost compilations.. we really outta count the cost
  137. >of the development of aircraft, windtunnels, chemeical processing which
  138. >produces LOX etc in these costs sometime if we really wanna be accurate..
  139. >
  140.  
  141. I would like to see you produce some "Accurate costs "  then.
  142.  
  143. as for accounting for  aircraft,  windtunnels,  chemical processing,
  144.  
  145. it is in the commercial price paid for these systems.
  146.  
  147. So do you agree that it's  really the same price to build new HSTS
  148. as it is to repair the old one?
  149.  
  150.  
  151.  
  152.  
  153. --
  154.  
  155. God put me on this Earth to accomplish certain things.  Right now,
  156. I am so far behind, I will never die.
  157.  
  158. ------------------------------
  159.  
  160. Date: 29 Jul 1993 08:35:37 -0500
  161. From: hvanderbilt@BIX.com
  162. Subject: DC-X Update 07/28/93
  163. Newsgroups: sci.space
  164.  
  165.                         DC-X News, July 28th, 1993
  166.  
  167.        Copyright 1993 by Henry Vanderbilt and Space Access Society.
  168.  
  169.  
  170.                          DC-X Test Program Status
  171.  
  172. DC-X Background (no change in this background section since 7/14 report)
  173.  
  174. DC-X is a low-speed flight regime testbed for a proposed reusable rocket-
  175. powered Single Stage To Orbit (SSTO) transport, McDonnell-Douglas Aerospace's
  176. "Delta Clipper".  DC-X is intended to prove out rocket-powered vertical
  177. takeoff, nose-first lifting-body to tail-first flight transition, and tail-
  178. first landing.  It is also intended to prove out rapid turnaround of a
  179. reusable rocket by a minimal ground support crew.
  180.  
  181. DC-X has already pretty much proved out rapid low-cost development of an
  182. advanced aerospace X-vehicle type engineering testbed by a small highly-
  183. motivated engineering team on a tight budget.  Of course, that's been done
  184. before -- just not recently.
  185.  
  186. DC-X stands 40 feet tall, is 13 feet across the base, and is roughly cone-
  187. shaped, with a circular cross-section forward blending into a square base.
  188. The vehicle has four maneuvering flaps, one set into each side near the base,
  189. and sits on four landing legs.  DC-X masses 22,300 lbs empty and 41,630 lbs
  190. fully fuelled, and is powered by four 13,500 lb thrust Pratt & Whitney RL-10-
  191. A5 liquid oxygen/liquid hydrogen rocket motors, each able to gimbal +- 8
  192. degrees.  The RL-10-A5 is a special version of the RL-10-A designed for wide
  193. throttling range (30% to 100%) and sea-level operation.
  194.  
  195. The single DC-X vehicle was officially rolled out of its construction hangar
  196. at MDA's Huntington Beach CA plant at the start of April, then trucked out to
  197. White Sands, New Mexico for ground and then flight tests.
  198.  
  199.  
  200. DC-X Test Program Chronology
  201.  
  202.  - Saturday, April 3rd -- The formal DC-X vehicle rollout took place at
  203.  McDonnell-Douglas's Huntington Beach plant, with speeches by various
  204.  luminaries plus free hot dogs for all.
  205.  
  206.  - Mid April -- DC-X was trucked out to White Sands, New Mexico for ground
  207.  trials on a borrowed NASA rocket test stand.
  208.  
  209.  - Thursday, May 20th through Thursday, June 17th -- DC-X underwent a series
  210.  of nine engine firings/vehicle systems exercises, including two firings in
  211.  one day with complete defueling/vehicle servicing/refueling in between.
  212.  
  213.  - Friday, June 18th -- The DC-X crew began breaking down the ground support
  214.  equipment and moving it to the White Sands Missile Range (WSMR) flight test
  215.  site, a distance of about fifty miles.  DC-X was stored in a hangar.
  216.  
  217.  - Friday, July 16th -- Ground support equipment move was completed.  DC-X
  218.  was taken out of storage, trucked out to the flight test site, and hoisted
  219.  upright on its launch pad.
  220.  
  221.  - Monday, July 19th -- The DC-X crew began running a series of ground tests
  222.  to make sure everything had made it over intact and was hooked back together
  223.  properly.
  224.  
  225.  
  226. Latest Flight Date Estimates
  227.  
  228. This brings us up to the present.  Final pre-flight testing is still
  229. underway, taking a bit longer than the DC-X crew had hoped.  New Mexico is in
  230. the middle of "monsoon" season, with frequent thunderstorms and blowing dust
  231. to gum things up.  Chances are the minor glitches normal to this sort of
  232. experimental program also contribute to the slow going.  The test crew does
  233. seem to have a commendable determination not to give in to "schedulitis" and
  234. fly before they're ready.  Things are running about a week to ten days behind
  235. the tentative target dates posted at the start of July.
  236.  
  237. The ground tests currently look like culminating in a "burp test" late next
  238. week.  This will be a four-second "hot firing" of DC-X's engines on the
  239. launch pad to check that all the plumbing is OK.
  240.  
  241. If the hot firing doesn't find any problems, the "bunny hop" flight stability
  242. test series should start shortly afterwards, possibly during the week of
  243. August 9th.  These hops will consist of takeoff, sideways transition of
  244. several hundred feet, and landing, done under varying wind conditions.  A lot
  245. of people will be keeping their fingers crossed during the initial "bunny
  246. hop", as it will be the first real-world test of DC-X's stability at low
  247. speed and altitude, a critical and hard-to-simulate part of the envelope.
  248. Fingers crossed, everybody.
  249.  
  250. The official first DC-X flight will actually be the initial flight of the
  251. second test series, when they'll be going for higher speeds and altitude.  At
  252. this point the "first" flight looks like taking place in mid-to-late August.
  253. This will be the one with speeches, hoopla, VIP's, and media coverage, but
  254. alas still no admission of the general public.  Chances are good for TV
  255. coverage though, between NASA Select, local TV stations, and the national
  256. networks.  Chances are too that you'll have a better view on TV, since the
  257. "VIP" viewing site will be five miles from the pad.
  258.  
  259. The end-for-end transition maneuver won't be tried until the third, final
  260. flight test series.
  261.  
  262.  
  263.  
  264.                      DC-X Followon: Political Status
  265.  
  266. Background (no changes in this background section since 7/22 report)
  267.  
  268. The current DC-X program is funded through flight test and data analysis this
  269. fall, and ends after that.  There is an ongoing effort to get the US Congress
  270. to fund a three-year followon program, currently called SX-2 (Space
  271. Experimental 2).  This tentatively looks like being a suborbital vehicle
  272. powered by 8 RL-10-A5 engines, capable of reaching Mach 6 (about 1/4 orbital
  273. velocity) and 100 miles altitude, built with orbital-weight tanks and
  274. structure, and able to test orbital grade heat-shielding.
  275.  
  276. The SX-2 program goal will be to demonstrate all remaining technology needed
  277. to build a reusable single-stage-to-orbit vehicle.  Once SX-2 has been
  278. tested, all that should be necessary to produce a functioning reusable SSTO
  279. is to scale up the SX-2 structures and install new larger rocket engines.
  280.  
  281. Proposed FY '94 funding for SX-2 startup is $75 million.  The money would
  282. come out of the $3.8 billion BMDO budget already pretty much agreed on for
  283. the coming year.  Total SX-2 program cost over the next three years would be
  284. very much dependent on the contractor chosen and the details of the design,
  285. but would be on the order of several hundred million.  This is the same order
  286. of magnitude as typical recent X-aircraft programs such as the X-29 and X-31.
  287.  
  288. SX-2 would start out under BMDO (formerly SDIO), so support from members of
  289. the House and Senate Armed Services Committees (HASC and SASC) is vital.  The
  290. actual name they know SX-2 by is "followon funding for BMDO's SSRT (Single
  291. Stage Rocket Technology) program."  The specific action we're calling for is
  292. for Congress to authorize $75 million in existing BMDO funding for this
  293. project next year -- we are not asking for any new funding authority, but
  294. rather for reallocation of existing funding toward a DC-X followon.
  295.  
  296.  
  297. Update, Wednesday 28 July
  298.  
  299. Representative Schroeder's House Armed Services Committee Research and
  300. Technology Subcommittee (HASC R&T for short) marked up their version of the
  301. DOD FY '94 Authorization Bill on Monday the 26th.  They included the $75m
  302. we've been asking for a DC-X followon program startup next year, as well as
  303. $5m for winding up the current DC-X program.  We've won a major battle in the
  304. fight for affordable access to space, and everybody who's worked on this
  305. deserves congratulations.  Three cheers for us!
  306.  
  307. The full HASC marked up yesterday, and we have no reason to believe there were
  308. any changes in DC-X followon funding.  The actual text of the DOD bill they
  309. approved won't be out for a few more days though.
  310.  
  311. The $75m was, we are told, accompanied by language directing that DC-X
  312. Followon be transferred from BMDO to ARPA, the Advanced Research Projects
  313. Agency, but also directing that the current BMDO DC-X management team be kept
  314. on the project.  One way of looking at this is that BMDO will run SX-2 as a
  315. contractor for ARPA -- this is a normal way of doing business for ARPA, which
  316. has a very small staff coordinating a lot of projects.
  317.  
  318. This may or may not be good news.  ARPA in theory is a more appropriate place
  319. for developing an X-rocket, but the current arrangement at BMDO is one we
  320. KNOW works.  Practically speaking though, BMDO is likely to be under heavy
  321. political pressure over the next couple of years.  Chances are that they
  322. wouldn't have been allowed to continue developing a reusable X-rocket in-
  323. house anyway.  The move to ARPA was probably inevitable.  We'll just have to
  324. watch how the program goes over the next few years, and be ready to raise a
  325. fuss if it shows signs of the sort of bureaucratic bog-down BMDO has been so
  326. good at avoiding.
  327.  
  328. Meanwhile, we need to stay awake for the next couple of weeks.  The next step
  329. is for the full House of Representatives to consider and vote on the DOD
  330. funding bill.  This may or may not happen before the one-month Congressional
  331. recess starting August 9th.  It's not likely, but there is always a chance
  332. our project could be cut when this goes to the full House.  Moving from BMDO
  333. to ARPA is probably a plus here; BMDO is a likely target of further attempts
  334. to reduce defense spending on the House floor.
  335.  
  336. Once the full House approves the Defense bill, the next milestone is the
  337. House-Senate Conference Committee, when the two bodies will resolve
  338. differences in their versions of next year's DOD budget.  You may recall that
  339. we got very little of what we need in the Senate version - a single $30m line
  340. item in the USAF budget for SSTO, NASP, and Spacelifter combined.  We'll need
  341. to make a maximum effort to let both sides of the Conference Committee know
  342. what we want when the time comes.  That almost certainly won't be until after
  343. the recess, however.
  344.  
  345.  
  346. SAS Action Recommendations
  347.  
  348. You might drop a note to Representative Dellums, Representative Schroeder and
  349. any other HASC members you have been in touch with, thanking them for their
  350. support.  If you have any contacts in the Senate Armed Services Committee, go
  351. on working them low-key -- there's no telling who will be on the Conference
  352. Committee, and we'll need all the help we can get on the Senate side when
  353. that eventually gets underway.
  354.  
  355. Other than that, stay tuned for updates, and enjoy the summer.
  356.  
  357.  
  358.  Henry Vanderbilt              "Reach low orbit and you're halfway to anywhere
  359.  Executive Director,                in the Solar System."
  360.  Space Access Society                              - Robert A. Heinlein
  361.  hvanderbilt@bix.com                    "You can't get there from here."
  362.  602 431-9283 voice/fax                                 - Anonymous
  363.  
  364.  
  365.  -- Permission granted to redistribute the full and unaltered text of this --
  366.  -- piece, including the copyright and this notice.  All other rights      --
  367.  -- reserved.  In other words, intact crossposting is strongly encouraged. --
  368.  
  369. ------------------------------
  370.  
  371. Date: 29 Jul 1993 09:57:32 -0400
  372. From: Pat <prb@access.digex.net>
  373. Subject: Hubble solar arrays: how'd they foul up?
  374. Newsgroups: sci.space
  375.  
  376. In article <28JUL199319281313@judy.uh.edu> wingo%cspara.decnet@Fedex.Msfc.Nasa.Gov writes:
  377. >
  378. >This is done pat. The ACTS satellite flying on the shuttle next week is an
  379. >example of a completely new communications technology (Including componets,
  380.  
  381. Actually ACTS is a 12 year old completely new communications
  382. technology.
  383.  
  384. ACTS is nice,  but we do need more and faster  experimental
  385. test beds.
  386.  
  387. >operational methodologies, and a new bus) that will be tested along with
  388. >their ground based compliments. The STRV satellite being built by BMDO and
  389.  
  390. I don't know about STRV.  But we do
  391. need to get more testing and qualification
  392. programs.
  393.  
  394. >
  395. >Also, on many shuttle flights now we are flying new stuff that is being
  396. >qualified, such as our MacIntosh SI Experiment controller. This obviously will
  397. >help to lower the costs of experiment hardware flown on the shuttle.
  398. >
  399.  
  400. WE are doing stuff on shuttle,  except  it's not a regular committed
  401. program  just to test  and qualify.  it's a loose ad-hox type thing.
  402.  
  403. A specific test program with test targets  is far better.
  404.  
  405.  
  406. >is inherent in the "let the commercial people" do everything. Fear of failure
  407. >in government usually only gets you re-assigned. Often in the commercial
  408.  
  409. Failure in government has a tendency to get one promoted
  410. as long as the paper trail doesn't point back to you.
  411.  
  412.  
  413. >be nowhere without it.  Many of the components of SEDSAT 1 are from
  414. >military programs that either lost their flight or are giving these to us
  415. >for the technology demonstration. Why? Because if we mess up it is not their
  416. >cookies in the fire.
  417.  
  418.  
  419. All the more reason for a regular  flight test office.
  420.  
  421. If the test office breaks something,  why it's
  422. part of the mission.
  423.  
  424. pat
  425.  
  426. --
  427.  
  428. God put me on this Earth to accomplish certain things.  Right now,
  429. I am so far behind, I will never die.
  430.  
  431. ------------------------------
  432.  
  433. Date: Thu, 29 Jul 93 09:05:07 PDT
  434. From: jim@pnet01.cts.com (Jim Bowery)
  435. Subject: Low Tech Alternatives, Info Post it here!
  436.  
  437. Gary Coffman <ke4zv!gary> writes:
  438. >Big dumb vehicles like Saturn were horrifingly expensive, $500 million
  439. >per launch and you threw away the vehicle after one use.
  440.  
  441. Truax would find this use of the phrase "big dumb" downright disgusting.
  442.  
  443. >For a really big rocket, Sea Dragon comes to mind, shipyard materials
  444. >and shipyard techniques make sense. But for the run of the mill small
  445. >rockets we use, and the small numbers we launch, we can use the best
  446. >materials so we can get the most from each launch. The cost of launcher
  447. >materials is one of the smaller costs in the total picture of getting
  448. >a payload into orbit and operating it there.
  449.  
  450. Given the prior abuse of the phrase "big dumb" I'm sure Truax wouldn't
  451. be surprised at this further confusion over the scale-economics of
  452. rocket engineering.
  453.  
  454. -----------------------------------------------------------------------------
  455.  Never attribute to ignorance that which can be attributed to self interest.
  456. -----------------------------------------------------------------------------
  457.  
  458. ------------------------------
  459.  
  460. Date: Thu, 29 Jul 93 09:06:24 PDT
  461. From: jim@pnet01.cts.com (Jim Bowery)
  462. Subject: Low Tech Alternatives, Info Post it here!
  463.  
  464. Paul Dietz <dietz@cs.rochester.edu> writes:
  465. >In article <1993Jul28.231213.9082@ke4zv.uucp> gary@ke4zv.UUCP (Gary Coffman)
  466. writes:
  467. >
  468. >> Autos are produced by the millions, rockets by the tens. Hand built
  469. >> Ferraris use $1,000/lb exotic composites too.
  470. >
  471. >Hardly that expensive!  The composites used in low volume auto
  472. >manufacturing are mostly fiberglass, which is more expensive than
  473. >steel, but not enormously more expensive.  Commercial E-glass costs
  474. >only a few dollars per pound.  Note, however, that the fiberglass is
  475. >used in places where very high strength is not important.
  476.  
  477. >The fact that things are built by hand does not necessarily make
  478. >expensive materials better.  Consider the experience with the
  479. >prototype steel tanks manufactured (by hand) by Boeing for the cost
  480. >optimized booster project in the late 60s.  They found reduction in
  481. >the per-pound cost of fabricated, tested steel tanks of an order of
  482. >magnitude over then-standard aluminum alloy tanks.  The reduction in
  483. >cost was due to a more forgiving, if lower performance, material, and
  484. >wider margins.  I shudder to think what those tanks would have cost if
  485. >made of aerospace grade graphite-epoxy.
  486.  
  487. I think there is some confusion between carbon-carbon and graphite-epoxy
  488. here.  The densification process that goes into the highest performance
  489. carbon-carbon is exceedingly expensive and results in the thousands of
  490. dollars per pound figures.  Graphite-epoxy is simply a higher grade of
  491. "fiber glass" that isn't all that expensive -- tens of dollars per pound.
  492.  
  493. I've seen a graphite-epoxy materials that are in striking distance of
  494. replacing sheet metal ship yards.  Serious negotiations are taking
  495. place right now in San Diego.
  496. -----------------------------------------------------------------------------
  497.  Never attribute to ignorance that which can be attributed to self interest.
  498. -----------------------------------------------------------------------------
  499.  
  500. ------------------------------
  501.  
  502. Date: 29 Jul 1993 14:01:06 GMT
  503. From: "Michael C. Jensen" <mjensen@gem.valpo.edu>
  504. Subject: NASA's planned project management changes
  505. Newsgroups: sci.space
  506.  
  507. Okay.. I've been areading again and have some interesting data to share
  508. with those of you interested in an efficient and responsible NASA..
  509.  
  510. According to Gene Krantz, director of Missions Operations Directorate,
  511. (the organization which manages all manned space operations, training,
  512. and such) NASA is on the brink of implementing a new NASA-wide
  513. policy of project management.. here is a brief synopsis..
  514.  
  515. All future and most currest NASA projects will implement a new
  516. system of project management and operations taken from experience
  517. and knowledge gained in successful commercial and government programs.
  518. All new projects will be developed and used in the following procedure..
  519.  
  520. NASA will internally determine the plans, requirements, and specifications
  521. of project X and implementation Y. This will be mostly done "in-house"..
  522. ie civil servants will determine what the goals of the project are, and
  523. the requirements of a system to meet those goals.. then the project will
  524. be opened for bidding, and a contractor (commercial) will receive the
  525. project X's specifications and requirements. The conractor will be free
  526. to develop system Y to meet project X's goals and requirements however
  527. the contractor wishes, as long as it meets the requirments. The contractor
  528. will then deliver finised product Y back to NASA, who will test, and the
  529. launch and use the product. This will give clear responsabilties to
  530. all involved. If the project X fails due to failure to meet the specifications,
  531. it'll be the contractors fault, and appropriate penalties will be given..
  532. if it fails due to improper or insufficient requirements or plans, it's
  533. NASA's fault, and the appropriate people will suffer..
  534.  
  535. In conjunction with this, the following guidelines will be in place..
  536. any project which runs 10% over budget will be reviewed by HQ and
  537. may face cancelation.. ANY project which runs 15% over budget will
  538. be cancled period.
  539.  
  540. This system is planned to be implemented over the next year.. at least
  541. that's the system as I've understood it from what I've heard and read..
  542. (ie this isn't a official set in stone law that will be enacted
  543. no matter what.. **shameless disclaimer**)
  544.  
  545. This system will apparently be implemented on ALL NASA programs and
  546. projects.. comments?
  547.  
  548. Mike
  549.  
  550. --
  551. Michael C. Jensen   Valparaiso University/Johnson Space Center
  552. mjensen@gem.valpo.edu  "I bet the human brain is a kludge." -- Marvin Minsky
  553. jensen@cisv.jsc.nasa.gov  *WindowsNT - From the people who brought you edlin*
  554. ---Disclaimer: The opinions expressed are my own... ---
  555.  
  556. ------------------------------
  557.  
  558. Date: Thu, 29 Jul 93 09:12:07 PDT
  559. From: jim@pnet01.cts.com (Jim Bowery)
  560. Subject: Omnibus Space Commercialization Act (Title II: Assets)
  561.  
  562. TITLE II--DISPOSITION OF GOVERNMENT OWNED SPACE FACILITIES, EQUIPMENT AND
  563. OTHER PROPERTY.
  564.  
  565. SEC. 201. SHORT TITLE.
  566. This title may be referred to as the "Space Privatization Act".
  567.  
  568. SEC. 202. INVENTORY OF FACILITIES.
  569.         (a) INVENTORY.--The Comptroller General shall conduct a comprehensive
  570. inventory of all space launch and launch support facilities,  other facilities
  571. related to providing space goods and services,  all government equipment at
  572. such facilities or at contractor sites owned by the United States Government,
  573. all patents and other intellectual property,   and shall identify such
  574. facilities,  equipment and other property which are surplus to public and
  575. national security needs.  This inventory shall be carried out in cooperation
  576. with the Department of Defense,  the National Aeronautics and Space
  577. Administration,  the Department of Transportation,  the Department of
  578. Commerce,  and the General Services Administration.
  579.         (b) REPORT.--Not later than 12 months after the date this Act enters
  580. into law,  the Comptroller General shall submit to the Congress a report
  581. containing the inventory and indentification required under subsection (a),
  582. including an item by item justification of why any facilities or equipment are
  583. not identified as surplus.  Portions of such report relating to the war
  584. fighting capabilities of the United States Department of Defense may be
  585. classified and protected from public disclosure if absolutely essential.
  586.         (c) REFERRAL FOR SALE.--All facilities and equipment not identified as
  587. requiring continued government ownership in whatever report will have been
  588. filed by the deadline under subsection (b) above shall be considered surplus
  589. and shall be referred to the General Services Administration for disposition.
  590. All surplus real property and structures suitable for general commercial or
  591. other private use,  and all other property deemed appropriate by the General
  592. Services Administration shall be transferred to the Resolution Trust
  593. Corporation to be disposed of through their usual procedures.  All income from
  594. such sales shall be treated as income from any other sales conducted by the
  595. Resolution Trust Corporation.
  596.  
  597. SEC.  203.  CRITERIA FOR SALE OF SURPLUS GOVERNMENT PROPERTY.
  598.         The General Services Administration shall attempt to maximize the net
  599. present value to the government of the surplus property disposed of by
  600. choosing the appropriate time and means of sale,  and by requiring the
  601. Government to immediately change procedures as required to use the facilities
  602. or equipment in a more businesslike manner so as to make them more attractive
  603. to prospective bidders.
  604.         The Resolution Trust Corporation shall liquidate all properties turned
  605. over to it in acordance with its usual procedures.
  606.         In general,  there shall be no qualifications required of the
  607. purchaser other than the ability to pay the price asked or bid.
  608.  
  609. SEC. 204. SALE OF FACILITIES WITH LIMITED EXCEPTIONS
  610.         All space and suborbital launch facilities and associated equipment
  611. shall be sold by January first,  1997.  All facilities,  such as the Space
  612. Telescope Science Institute,  which are intended to operate spacecraft or
  613. otherwise provide space services,  shall be sold,  and the portion of the NASA
  614. budget previously allocated to them shall be divided among the nongovernmental
  615. users of the facility as grant support.  All government owned,  contractor
  616. operated  facilities shall be sold at pubic auction within two years of the
  617. date this act enters into law.
  618.  
  619. SEC. 205. SALE OF SURPLUS EQUIPMENT.
  620.         All government owned equipment located at facilities owned by NASA
  621. contractors,  or purchased by them, or government owned equipment located at
  622. facilities sold pursuant to this title,  shall be sold by January first,
  623. 1997.  Any such equipment not sold within this period shall be abandoned in
  624. place.
  625.         All space transportation vehicles and space transportation vehicle
  626. components owned by the government shall be sold by January first,  1997,
  627. with the exception of space transportation vehicles owned by the Department of
  628. Defence,  and neccessary to war fighting capability.
  629.         All space transportation vehicles and components which become surplus
  630. to their originally intended government need shall be sold at public auction
  631. within 180 days of becoming surplus.
  632.  
  633. SEC. 206. SALE OF SPACE SHUTTLES AND RELATED FACILITIES AND EQUIPMENT.
  634.      (a) THE SPACE SHUTTLE--The space shuttle shall be privatized by January
  635. first,  1997,  and all monies authorized and appropriated for its direct or
  636. indirect support shall be apportioned among the various NASA centers in
  637. proportion to their share of the remainder of the NASA budget at that time.
  638.      All civil servants who currently work in direct or indirect support of
  639. shuttle flight operations or continuing shuttle development shall be retired
  640. by January first,  1997,  or on the date title to the space shuttle orbiters
  641. is transferred to private parties,  whichever comes first.  In recognition of
  642. their support of the U. S. Space Program,  they shall all be retired as if
  643. they had ten additional years of service (or minimum service to merit
  644. retirement,  if this is greater).
  645.      Those portions of the Johnson space center devoted to Shuttle mission
  646. planning,  support, and control,  as well as those portions devoted to
  647. engineering support for the shuttle,  shall be sold by January first,  1997.
  648.     The shuttle assembly,  servicing and launch facilities at the Kennedy
  649. Space Center shall be sold by January first,  1997,  along with all other
  650. launch facilities.
  651.      The various shuttle related equipment and facilities owned by the Federal
  652. Government,  such as the 747 carrier aircraft,  shall be sold by January
  653. first,  1997.
  654.         FEDERAL GOVERNMENT SPACE PROPERTY--Property relating to the provision
  655. of space services or manufacture of space goods shall be acquired, owned,
  656. maintained, or operated by the Federal Government only if procurement of all
  657. major subsystems and subsystem elements is carried out according to section 5,
  658.  and only  as required under circumstances described elsewhere in this Act.
  659.         (f) PHASE-IN PERIOD--Subsections (a) and (e) shall not apply to
  660. existing activities for one year after the date this act enters into law.
  661. Thereafter,  all remaining property shall be sold by January first,  1997.
  662.         (g) All shuttles and related facilities and equipment shall be sold at
  663. public auction by January first,  1997.  Once privatized,  space shuttles may
  664. be used to fly government payloads as long as they comply with all other
  665. requirements of this Act,  and as long as the companies owning and operating
  666. them have no cost plus or level of effort contracts with the United States
  667. Government.
  668.  
  669. SEC. 207. DISPOSITION OF GOVERNMENT HELD INTELLECTUAL PROPERTY
  670.         (a) INTELLECTUAL PROPERTY--All space related patents,  trade secrets,
  671. and other intellectual property rights the United States government posesses
  672. shall be privatised as follows:
  673.         (1) Licensed rights shall be quitclaimed to the current licensee;
  674.         (2) All other intellectual property shall be sold at public auction by
  675. January first,  1997;  and
  676.         (3) All intellectual property not disposed of above shall be placed in
  677. the public domain.
  678.         (b) AUCTION OF INTELLECTUAL PROPERTY.-- The GSA shall hold public
  679. auctions no less frequently than once every six months to dispose of all
  680. intellectual property to be disposed of under subsection 2 above.  All
  681. intellectual property shall be offered at each auction,  with minimum bids
  682. being selected by the GSA to ensure the greatest net present value to the
  683. government of the auction returns.
  684.  
  685. (to be continued)
  686. -----------------------------------------------------------------------------
  687.  Never attribute to ignorance that which can be attributed to self interest.
  688. -----------------------------------------------------------------------------
  689.  
  690. ------------------------------
  691.  
  692. Date: Thu, 29 Jul 93 09:04:25 PDT
  693. From: jim@pnet01.cts.com (Jim Bowery)
  694. Subject: Retro Aerospace
  695.  
  696. George William Herbert <gwh@soda.berkeley.edu> writes:
  697. >In article <CAw31s.B71.1@cs.cmu.edu> jim@pnet01.cts.com (Jim Bowery) writes:
  698. >>George William Herbert <gwh@soda.berkeley.edu> writes:
  699. >Well, OSC turned a profit, which is just about a first among
  700. >Aerospace startups.  This has to count for something.
  701.  
  702. I don't want to totally discount OSC.
  703.  
  704. Here's what OSC deserve(d) credit for:
  705.  
  706. 1) They were perhaps the ONLY aerospace startup run by guys born after
  707. 1950. (ie: late boomers not in a demographic position to abuse a huge
  708.  influx of naive, underpaid and well educated workers to cover up all their
  709.  stupid management decisions and therefore suffer the corresponding lack
  710.  of disciplin)  Pretty much anything else I have to say positive about
  711. them derives from this fact.
  712.  
  713. 2) They recognized that the primary value in the aerospace industry had
  714. sunk to the bottom -- in the underpaid subcontractor shops and bottom
  715. rung employees that serve the big porkbarrel paper mill giants -- and
  716. that this represented an enormous untapped market inefficiency.
  717.  
  718. 3) They had what it took politically to start and run an aerospace
  719. business in the exceedingly pathological climate of the last decade.
  720.  
  721. These were enough to make them a going concern and serve as DARPA's
  722. well-controlled "free enterprise" token to be paraded around for
  723. political purposes.  OSC's primary purpose in life is to pretend
  724. to be a true entrepreneurial space start up (when they are totally
  725.  dependent on their government connections) and then make noises
  726. about doing every idea for a space business that some guy like you
  727. or I might come up with -- with the implication that they have the
  728. political connections to scare our sources of financing away unless
  729. we too play the "strategic partner" game.  This serves the existing
  730. socialist (actually national socialist) structure of the aerospace
  731. industry very well.
  732.  
  733. >Well, the holding company will be Fortune 500 if I'm lucky and
  734. >they all work out...  I think we're arguing over semantics.
  735. >I classify a bunch of small skunk-works like organizations operating
  736. >under one owner management as one big business,
  737. >whereas you're saying it's a bunch of small ones.
  738.  
  739. This is the Cypress Semiconductor used by T.J. Rogers.  It's not
  740. bad compared to the "one big happy bureaucracy" of companies like Intel.
  741. I believe it is inferior to the model Paul Barron uses in his startups,
  742. which is a loose confederation of highly selected collegues that come
  743. together and go their separate ways in different combinations to exploit
  744. the rapidly changing environment.  I always envisioned Paul as Mr. Briggs
  745. on Mission Impossible sorting through his folder of pictures.
  746.  
  747. Come to think of it, Paul IS pretty tight with the spooks... (or more
  748.  accurately, they are tight with him).
  749.  
  750. >It could be three, two, one, twenty, who knows... but my market models
  751. >indicate that to sustain development and keep dropping prices, you want
  752. >to fly about 10 rockets a year per company.
  753.  
  754. You're assuming too much vertical integration and too little potential
  755. for early innovation.  Remember, we've been suppressing cost/lb
  756. innovation in space transport for literally decades.  There is a lot
  757. of pent-up technology waiting to be applied if a reasonable commercial
  758. market actually emerges from our bureaucratic malaise.
  759.  
  760. When the price drops by a factor of 2 (which will happen almost immediately
  761.  in the emerging commercial market) the $ volume of business will actually
  762. go up... that means the launch rate will more than double.  How far this
  763. will go gets into the market flexibility issue again.  I think you are
  764. better off thinking "cars" than "rockets" or even "airplanes".  In the
  765. automobile industry, the U.S. adopted the "big 3" model while the Japanese,
  766. who are much better at running such large businesses, have on the order
  767. of 10 integration companies and hundreds if not thousands of job shops.
  768.  
  769. Since the Japanese kicked our big 3 buttocks in the 1970's (thank God,
  770.  or the Emperor or whoever, you little slanty-eyed bastards came along
  771.  and knocked some sense into us -- keep it up) innovation has picked
  772. up again from where it was stopped about the time Tucker was put out of
  773. business by the big-3 based on arguments of the type you are now
  774. presenting.  And rocket/space transport has a LONG way to go compared to
  775. automobiles.
  776.  
  777. PS:  Aviation is in pretty much the same condition that automobiles were
  778. in the 60's and 70's -- too monopolistic, using the "its just too expensive
  779.  to afford the luxury of competition" argument and just begging to have
  780. its butt kicked around the block by some more of those oriental bastards.
  781.  
  782. Here's a tip to kids in college:  Now's a really good time to learn
  783. Mandarin, grab some suppressed aviation inventors here int he U.S. and
  784. find a few wealthy refugees from Hong Kong who want to start innovative
  785. aviation businesses with manufacturing on mainland China.
  786.  
  787. >Look at what's happening to personal computers right now as an
  788. >example... we've got a horde of cheap clone makers with no
  789. >engineering staffs driving the per-item costs off a cliff.
  790. >Great for the consumer today, but Apple (which was a leading technical
  791. >development innovator) is in serious trouble now, which is endangering
  792. >the next two or three generations of computers.  And it's not just
  793. >apple, everyone's being hit hard.
  794.  
  795. You're looking at the cheap clone makers and not at the industry
  796. they're based on.
  797.  
  798. I'm not sweating the situation, but for reasons you would find
  799. incomprehensible.  The Intel/Microsoft axis is losing its strangle-
  800. hold grip on comeptition within the basis of the industry.
  801.  
  802. Besides, the lack of vertical integration you seem so worried about
  803. all the time is precisely what has driven competition and therefore
  804. innovation in electronics.
  805.  
  806. >>The actual situation will be a few big companies in countries like Japan
  807. >>enjoying the majority of the market with the minority of the profitability
  808. >>using mature technologies for which they are paying royalties to people
  809. >>like you, so you can develop your next regime of space access technology
  810. >>despite their desires that you would retire.  Of course, it would help
  811. >>a lot if our State Department started aggressively enforcing our
  812. >>intellectual property rights rather than fighting for supposedly "job
  813. >>protecting" protectionist policies that actually gut our economy.
  814. >
  815. >Royalty arrangements like this are very difficult to make happen.
  816. >This may turn out to work, but I'm not optimistic.  If it does
  817. >work, I'll probably adopt that model...
  818.  
  819. That's only because, for a while, our government thought it was being
  820. clever by serving our domestic bureaucrats at the expense of our
  821. independent innovators.  This got so out of hand that Bush even started
  822. exchanging intellectual property issues for manfacturing issues
  823. during trade talks.  However, someone in the Clinton administration
  824. is giving good advice and has started paying attention to intellectual
  825. property as our primary national strength.  If this trend continues, and
  826. I have good reason to believe it will, such royalty arrangements will
  827. become standard business practice.
  828. -----------------------------------------------------------------------------
  829.  Never attribute to ignorance that which can be attributed to self interest.
  830. -----------------------------------------------------------------------------
  831.  
  832. ------------------------------
  833.  
  834. From: John McGlaughlin <lazarus@mac.dev.cdx.mot.com>
  835. Newsgroups: sci.space
  836.  
  837. Subject: Happy 35th NASA
  838. Message-Id: <lazarus.743948612@mac.dev.cdx.mot.com>
  839. Sender: Merlin News System <news@merlin.dev.cdx.mot.com>
  840. Nntp-Posting-Host: mac.dev.cdx.mot.com
  841. Organization: Motorola Codex, Canton, Massachusetts
  842. Date: Thu, 29 Jul 1993 12:23:32 GMT
  843. Lines: 6
  844. Source-Info:  Sender is really news@CRABAPPLE.SRV.CS.CMU.EDU
  845. Source-Info:  Sender is really isu@VACATION.VENARI.CS.CMU.EDU
  846.  
  847. Happy Birthday NASA....
  848. Let us hope that Gov.t gets their act together to give you at least 35 more
  849. -jftm-
  850. --
  851.  
  852. -jftm-
  853.  
  854. ------------------------------
  855.  
  856. End of Space Digest Volume 16 : Issue 943
  857. ------------------------------
  858.